AFTERBAY RESERVOIR
- Disturbed Area: 44.4-hectares
- Upper-Level Liquid Area: 325,000-m2 (32.5-hectares)
- Bottom-Level Liquid Area: 2,000-m2 (2.0-hectares)
- Liquid Depth: 64.0-m, Freeboard: 1.0-m (Above Upper Liquid Level)
- Average (50% of Volume) Liquid Depth: 36-m
- Liquid Storage: 1,046 hectare-meters
- Dam Type: Rockfill with concrete face (Balanced Cut & Fill),Spillway: To Be Determined
- Annual Evaporation: 21 hectare-meters (1.3-meters per year)
- Rain/Snow Catchment Area: 1,295-hectares, Annual Moisture (3”): 99 hectare-meters
FOREBAY RESERVOIR
- Disturbed Area: 71.6-hectares
- Upper-Level Liquid Area: 330,000-m2 (33.0-hectares)
- Bottom-Level Liquid Area: 87,000-m2 (8.7-hectares)
- Liquid Depth: 50.0-m, Freeboard: 1.0-m (Above Upper Liquid Level)
- Average (50% of Volume) Liquid Depth: 28-m
- Liquid Storage: 1,046 hectare-meters
- Dam Type: Rockfill with concrete face (Balanced Cut & Fill),Spillway: To Be Determined
- Annual Evaporation: 27 hectare-meters (1.3-meters per year)
- Rain/Snow Catchment Area: negligible, Annual Moisture: negligible
RESERVOIR HEAD DATA
- Average Static Head: 1,157-meters
- Maximum Falling Head: 1,214-meters
- Minimum Falling head: 1,100-meters
POWERHOUSE, FLOWS and EQUIPMENT
- Ternary Type PSH with single speed sync Motor/Generators
- No. Powerhouses: 2
- Total No. Turbine/Pump Units: 6 (3-Units per Powerhouse)
- Water Flow per Turbine/Pump Unit: 29.4-m3/sec, All Turbines: 176.5-m3/sec
- Maximum Power Output: 2-GW
- Maximum Duration (Based on Reservoir): 12-hrs
- Annual Power Generation: 12-hr. Periods: 8,760-GWh, 10-hr. Periods: 7,300-GWh
- Pump Cycle Efficiency: 87.2%
- Turbine Cycle Efficiency: 88.6%
- Round Trip Efficiency (RTE) with losses and Leakage: 77.1%
- Motor/Generator Units: 382-MW
UNDERGROUND EXCAVATIONS
- Access Tunnel Network: 8,640-m
- Tailrace Discharge Branches: 3,580-m
- Powerhouse Tailraces, Penstocks, Accesses: 2,260-m
- Intake Shafts: 1,274-m
- Discharge Shafts: 43-m
- Secondary Ventilation/Access Shaft: 1,270m
ELECTRICAL and TRANSMISSION
- Generator output underground 23kV, increased to 500kv at an underground substation
- Surface substation will reduce to a 500kV OH line, 53-km in length
- 2,000MW will be delivered via the 500kV OH line
- The high voltage lines will deliver to the connection with a VD of less than 2-percent
- Generators Power Factor: 87.5% Lagging
MISCELLANEOUS
- Required new road construction Forebay: 19-km
- Required new road construction Afterbay: 10-km
- Makeup water: There is some water flowing in Sore Canyon and a well field will be considered in the alluvial.
- Project located on: Private land
- Makeup water pumping requirements is 66.2-m3/hr. pumping 20-hrs/day